# Saving Hours for Production Planners



> Generate first-draft cutting plans in minutes. Track the right material, cut scrap by up to 50%, and keep orders moving to dispatch.
> 
> **URL:** https://www.gosmarter.ai/solutions/production/

**Last updated:** 2026-11-06


---


Plan Smarter. Deliver Faster.


## Key Capabilities

- **Cutting Optimisation**: Generate optimised cutting plans using live stock and offcuts to maximise material yield and reduce scrap.
  - **Smart Material Tracking**: Track the right material for every job using live inventory, mill certificates, and traceability data.
  - **Live Inventory Visibility**: See available stock, reserved material, and offcuts in real time to plan with confidence.
  - **Production Readiness**: Ensure material, certificates, and compliance checks are complete before work reaches the shop floor.
  - **Order Tracking**: Track every order from planning to dispatch with live production and inventory updates.
  - **Offcut Management**: Capture, store, and reuse offcuts to reduce waste, lower material costs, and improve profitability.
  
  

## The Opportunity


_Stop doing busy work_



If you're spending time on paperwork, you're not making product. GoSmarter eliminates manual tasks that slow production and waste material.

- **Faster Cutting Plans**: Generate optimised cutting plans for bar, plate, tube, and sheet using available stock, reusable offcuts, and live orders. Review, adjust, and send them straight to production.
- **Smarter Stock Use**: Prioritise reusable offcuts and existing inventory before consuming new stock, reducing waste and unnecessary purchases.
- **Built In Traceability**: Mill certificates are automatically linked to the correct heat code and stock. If the material grade doesn't match the job, GoSmarter flags it before production, preventing costly mistakes.



## Why GoSmarter


_The Savings_



{{< savings-split >}}
{{< savings-hero number="140+ hrs" label="Saved every year" >}}
Automating cutting plans, mill certificate processing, and inventory admin. Our [Cutting Optimiser](https://www.gosmarter.ai/features/cutting-optimiser/) maximises yield from live stock and offcuts.
{{< /savings-hero >}}
{{< savings-figures >}}
{{< savings-figure label="Less scrap using the Cutting Optimiser" value="20–50%" />}}
{{< savings-figure label="Time to go live" value="Day 1" />}}
{{< /savings-figures >}}
{{< /savings-split >}}

{{< savings-support >}}
{{< savings-support-item title="Faster Production Planning" icon="fa-bolt" >}}
First-draft cutting plans in minutes, not spreadsheets.
{{< /savings-support-item >}}
{{< savings-support-item title="Better On-Time Delivery" icon="fa-truck-fast" >}}
Plan against live inventory and live orders, not guesswork.
{{< /savings-support-item >}}
{{< savings-support-item title="Works with Your Existing Systems" icon="fa-plug" >}}
Works alongside your ERP and planning systems. No replacement project.
{{< /savings-support-item >}}
{{< /savings-support >}}

### How a typical production day changes

Before GoSmarter, the morning starts with a stack of jobs. A planner manually matches them to available stock: checking a spreadsheet, walking the yard, ringing the stock controller. It takes 90 minutes to build a cutting plan that is already out of date by the time it prints.

After GoSmarter, the planner opens the app, reviews the live order list against real stock, and generates a first-draft cutting plan in minutes. The plan knows about available lengths, remnants from yesterday's jobs, and grades linked to their mill certificates. The whole process takes 20 minutes.

That is not a theoretical improvement. It is what production planners who switch from manual planning to GoSmarter routinely report.

### What each role gets back

{{< role-cards >}}
{{< role-card title="Production Planners" icon="fa-user-gear" >}}
Get time back. The 90-minute morning planning session drops to 20 minutes, an extra hour a day for optimising job sequences and handling urgent orders, not data entry and stock checking.
{{< /role-card >}}
{{< role-card title="Saw Operators" icon="fa-user-shield" >}}
Get clarity. Every job comes with a cutting plan specifying exact lengths, bar counts, and which stock to pull. No guesswork, no back-and-forth with the planner mid-shift.
{{< /role-card >}}
{{< role-card title="Production Managers" icon="fa-user-tie" >}}
Get visibility. See which jobs are in progress, waiting on material, or at risk of missing despatch, at any point in the day. Problems surface in planning, not when the lorry arrives.
{{< /role-card >}}
{{< /role-cards >}}

### Connecting production to the rest of the business

GoSmarter does not stop at the saw. When a cutting job is completed, the stock record updates automatically. Offcuts become live stock without anyone manually logging a remnant. Completed jobs link back to open orders, giving sales and despatch a live view of what is ready to ship.

When your inventory is accurate and your production progress is visible, the rest of the business can plan around it. Sales can give accurate lead times. Despatch can book haulage in advance. The operations manager can stop starting every morning with a crisis meeting about yesterday's problems.



## Customer Spotlight: Midland Steel




Midland Steel trialled GoSmarter's Rebar Optimiser to tackle a problem that costs the industry millions: offcuts too short to reuse, going straight in the scrap bin.

The optimiser evaluates thousands of cutting combinations across a full order set, weighing bar utilisation, waste, and the carbon footprint of leftover material. Midland Steel ran it across 734 tonnes of steel and 193 jobs.

- 50% reduction in scrap
- Digital scrap tracking replacing paper records, via the Offcut Tracker and Scrap Weight Tracker apps
- Lower carbon emissions and lower cost of handling waste

[Read the full Midland Steel Rebar Optimiser case study](https://www.gosmarter.ai/Midland%20Steel%20Rebar%20Optimiser%20case%20study.pdf)





## Common Questions



### How much scrap can GoSmarter's Cutting Plans reduce?

In trials with long-products manufacturers, [Cutting Plans](https://www.gosmarter.ai/features/cutting-optimiser/) has reduced scrap rates by up to 50% compared to manual cutting plans. The exact saving depends on your current process and the mix of orders you run, but any business generating off-cuts from bar, tube, or plate stock will see a measurable improvement.




### What materials does Cutting Plans support?

Cutting Plans handles any linear cutting problem: steel bar, aluminium extrusion, tube, rebar, timber, and other long products. It is material-agnostic. If you're cutting stock lengths to customer requirements and generating off-cuts in the process, the optimiser will find a better plan.




### Does GoSmarter work with our existing production planning tools?

Yes. GoSmarter can integrate with existing workflows via [CSV](https://www.gosmarter.ai/docs/integration-strategy/#csv-import-export) import/export and the [REST API](https://www.gosmarter.ai/docs/integration-strategy/#api-integration). Many customers use GoSmarter alongside a basic enterprise resource planning (ERP) or job-management system. GoSmarter handles the cutting plans and material tracking while the ERP manages the order book and invoicing.




### How does GoSmarter handle quality checks during production?

Quality checks during production are not currently a GoSmarter feature. We think this is better handled in your manufacturing execution system or MES. That said, GoSmarter does automate compliance documentation and certificate traceability, removing a significant admin burden from the production process. If this is something you need, [contact us](https://www.gosmarter.ai/contact).



## AI Cutting Plans Against Certified Stock: From Day One

GoSmarter's Production tier gives you AI cutting plans tied to your certified, live inventory. Import your current order list and existing stock from a spreadsheet and run your first cutting plan in under an hour. Grade compliance is verified before any job starts. Scrap is tracked per cut. {{< pricing-offer >}}, so the returns come before the full cost does.

Most teams see a measurable reduction in scrap within their first week of live use. Once you have a cutting plan running against real stock, the offcuts from each job automatically become available material for the next. That compounding effect, where remnants get used before new stock is ordered, is where the biggest savings come from.

## Go deeper

- [Shop Floor Planning Software for Metals](https://www.gosmarter.ai/hubs/shop-floor-planning-software/) — how GoSmarter connects live inventory, open orders, and AI cut planning for your production floor
- [Scrap, Waste & Yield Optimisation](https://www.gosmarter.ai/hubs/scrap-waste-yield-optimisation/) — the complete guide to reducing scrap in metals manufacturing with AI-powered cutting optimisation
- [Spreadsheet-to-System Planning for Metals](https://www.gosmarter.ai/hubs/spreadsheet-to-system-planning/) — how to move from Excel-based production planning to a connected, live system
- [Midland Steel Manufacturing Case Study](https://www.gosmarter.ai/casestudies/midland-steel/) — how a leading rebar manufacturer cut scrap rates by 50% with optimised cutting plans
- [AI tools for production scheduling in metals](https://www.gosmarter.ai/blog/ai-tools-production-scheduling-metals/) — a deep dive into how AI improves scheduling accuracy and reduces late orders

